5

Armoring Installation

4-8 weeks

Ballistic materials are precisely installed according to our engineering specifications. This is the core of the armoring process.

Steel panels are cut, formed, and welded. Composite layers are applied. Overlap areas are carefully sealed to eliminate gaps in protection.

What Happens

  • Steel panel installation
  • Composite layer application
  • Overlap sealing
  • Floor protection installation
  • Roof protection installation